上海合慶鎮(zhèn)2024年生態(tài)清潔小流域河道綜合整治工程(綠化搬遷)的競爭性磋商公告
項目概況
Overview
合慶鎮(zhèn)2024年生態(tài)清潔小流域河道綜合整治工程(綠化搬遷)采購項目的潛在供應商應在上海市政府采購網(wǎng)獲取采購文件,并于2025年08月27日 13:30(北京時間)前提交響應文件。
Potential Suppliers for 2024 Ecological Clean Small Watershed River Comprehensive Improvement Project (Greening Relocation) in Heqing Town should obtain the procurement documents from (http://www.zfcg.sh.gov.cn/) and submit response documents before 27th 08 2025 at 13.30pm(Beijing time).
一、項目基本情況
1. Basic Information
項目編號:310115110250528113634-15256230
Project No.: 310115110250528113634-15256230
項目名稱:合慶鎮(zhèn)2024年生態(tài)清潔小流域河道綜合整治工程(綠化搬遷)
Project Name: 2024 Ecological Clean Small Watershed River Comprehensive Improvement Project (Greening Relocation) in Heqing Town
預算編號:1525-W11014728
Budget No.: 1525-W11014728
采購方式:競爭性磋商
Procurement method : competitive consultation
預算金額(元):2500000元(國庫資金:0元;自籌資金:2500000元)
Budget Amount(Yuan): 2500000(National Treasury Funds: 0 Yuan; Self-raised Funds: 2500000 Yuan)
最高限價(元):包1-2009200.00元
Maximum Price(Yuan): Package No.1 for 2009200.00 Yuan,
采購需求:
Procurement Requirements:
包名稱:合慶鎮(zhèn)2024年生態(tài)清潔小流域河道綜合整治工程(綠化搬遷)
Package Name: 2024 Ecological Clean Small Watershed River Comprehensive Improvement Project (Greening Relocation) in Heqing Town
數(shù)量:1
Quantity: 1
預算金額(元):2500000.00
Budget Amount(Yuan): 2500000.00
簡要規(guī)則描述:本工程建設內(nèi)容為合慶鎮(zhèn)勤奮村、朝陽村、前哨村、向東村、友誼村、青四村、春雷村、青三村、大星村等9個村區(qū)域生態(tài)清潔小流域河道綜合整治工程綠化搬遷工程,主要工作內(nèi)容包括移除水杉、垂柳、構(gòu)樹、桑樹等喬木;移除棕櫚、夾竹桃等灌木;移除蘆葦、再力花;移植女貞、香樟、廣玉蘭、樸樹、桂花、竹子、紅葉石楠球、衛(wèi)矛球等苗木。(具體數(shù)量及要求詳見工程量清單及圖紙。)
Brief Specification Description: The construction content of this project is the greening and relocation project for the comprehensive improvement of ecological clean small watershed rivers in 9 village areas, including Qinqin Village, Chaoyang Village, Qianshao Village, Xiangdong Village, Youyi Village, Qingxi Village, Chunlei Village, Qingshan Village, Daxing Village, etc. in Heqing Town. The main work includes the removal of trees such as water spruce, weeping willow, mulberry tree, and mulberry tree; Remove shrubs such as palms and oleander; Remove reeds and regrow flowers; Transplant seedlings such as Ligustrum lucidum, Camphor tree, Magnolia grandiflorus, Camphor tree, Osmanthus fragrans, Bamboo, Red leaved Nanboku, and Euonymus japonicus. (For specific quantities and requirements, please refer to the bill of quantities and drawings.)
合同履約期限:工期要求:施工工期60日歷天(計劃開工日期:2025年09月01日)
The Contract Period: Construction period requirement: Construction period of 60 calendar days (planned start date: September 1, 2025)
本項目(否)接受聯(lián)合體投標。